Technical Pages
- Cargo-based Template-Form-Table Architecture
- Cargo Queries
- Categorization System
- Category Update (2024)
- Changing Categories, RegEx, and ReplaceText
- Development Backlog
- Development Log
- Development Roadmap
- Iconography
- Integrating SER Standards into Wiki Structures
- New Page Type Templates (2024-25)
- New Page Type Templates (2024-25)/Workgroups
- New Templates - Products
- New Templates - Products/File Pages
- New Templates - Products/Main Pages
- New Templates - Products/No Year
- New User Experience
- Page Editing Forms
- Page Preview Troubleshooting
- Page Templates
- Platform Architecture
- Platform Technical Specifications
- Potential Categories
- Promotional Materials
- Terminology
See Introduction Pages
This page provides all materials for development of the Effort Template and migration of existing workgroups.
Assumptions
- Association of workgroups will be through the acronym field and will happen using Category:Acronym
- All other field values are default or derived from page categories, using similar methods as for Products.
Migration Instructions
There are 274 Standard Pages, and 18 Architecture or Content Pages. The only pages that use the Effort Category that are not in the template are the sub-categories.
- Effort Name - derived from page name
- Start Year - default is null; this will be manually added upon edit; not mandatory
- Milestone Year - default is null; this will be manually added upon edit; not mandatory
- End Year - default is null; this will be manually added upon edit; not mandatory
- Architecture - 3 values: Standard, Architecture Page, Content Page. based on category, default is "Standard" for 266... 18 have a category already
- Category:Architecture Page = "Architecture Page"
- Category:Content Page = "Content Page"
- Effort Type - based on category tree under Category:Effort
- Effort Credit - This uses Category:Acronym. Where a category within the acronym category is found, then use the category name as a value within the List of String. Later we can do manual QAQC and tie this to the Acronym Field in the Workgroup Table.
- Jurisdictions - based on category tree under Category:Ecosystem Topics
- Places - based on category tree under Category:Place
- Workgroups - based on category tree under Category:Workgroup
- AnthroTopics - based on category tree under Category:Anthropogenic Topics
- EcoTopics - based on category tree under Category:Ecosystem Topics
Effort + Architecture Page
- Adaptive Management
- Advocacy
- Arts and Crafts
- Coordination
- Education
- Green Infrastructure
- Integrated Ecosystem Management
- Legislation
- Lessons
- Monitoring
- Planning
- Protection
- Puget Sound Ecosystem Funding
- Research
- Restoration
- Social Change
Workgroup + Content Page
Workgroup Template + Not Cont/Arch Page
- A Road Map to Washington's Future
- American Recovery and Reinvestment Act of 2009 (ARRA)
- Anacortes Community Forest Lands
- Anna Smith Park Bulkhead Removal
- Aquatic Lands Enhancement Account (ALEA)
- Aquatic Organism Passage (AOP)
- Automating Landscape Connectivity for Puget Sound River Deltas and Pocket Estuaries
- Barnaby Reach Restoration
- Beach Strategies for Nearshore Restoration and Protection in Puget Sound
- Beach Strategies for Nearshore Restoration and Protection in Puget Sound/Straw Dog
- Black River Farm
- Blue Heron Mitigation Bank
- Brian Abbott Fish Barrier Removal Board
- British Columbia Coastal Marine Strategy
- Building Resilient Infrastructure and Communities (BRIC)
- Bulkhead Removal Feasibility for Localized Restoration
- Canyon Lake Community Forest
- Charlotte Martin Foundation
- Chinook Response to Estuary Restoration
- Chuckanut Village Marsh Restoration Project Monitoring
- Clallam County Oil Spill Preparedness and Response
- Clean Samish Initiative
- Coastal Blue Carbon Project
- Coastal Change Analysis Program (C-CAP)
- Coastal Protection Fund - Terry Husseman Account
- Coastal Resilience to Climate Change
- Community Forests Program (CFP)
- Community-based Restoration Program (CRP)
- Conservation Innovation Grant (CIG)
- Conservation Project Budget Standards
- Conservation Reserve Enhancement Program (CREP)
- Conservation Using Acquisition
- Continuous Improvement
- Continuous Improvement/Claims
- Continuous Improvement/The Prototype
- Coordinated Investment
- Country Club Road Stream Crossing at Green Cove Creek
- Crescent Harbor Lagoon Restoration
- Culvert Replacement Regulatory Coordination
- Deepwater Slough Restoration
- Delta Metrics Project
- Deschutes Estuary Restoration Project
- Designing large wood placement in tidal marshes
- Dungeness Off Channel Reservoir
- Edgewater Beach Bulkhead Removal
- Ediz Hook Restoration
- Edwards Mother Earth Foundation
- Effects of Exposed Tidal Flats on Water Temperature in the Snohomish Estuary
- Elwha Dam Removal
- Elwha Estuary Dike Removal
- Environmental Quality Incentives Program (EQIP)
- Envision Skagit 2060
- Estimation of Typical High Intertidal Beach-Face Slope in Puget Sound
- Estuary Restoration for Northern Puget Sound Birds
- Estuary and Salmon Restoration Program (ESRP)
- Estuary science to support adaptive management (Salish Sea 2011)
- Evaluating Puget Sound Beach Services for Protection and Restoration
- Evaluating Salmon Rearing Limitations in River Deltas
- Everett Marshlands Restoration
- Everett Riverfront Wetlands
- Family Forest Fish Passage Program (FFPPP)
- Farmhouse Reach Floodplain Restoration
- Feeder Bluff Mapping
- Feeder Bluff Outreach and Armor Removal (Island and Jefferson counties)
- Fidalgo Bay Nearshore Monitoring Project
- Fir Island Farm Restoration
- Fire and Flow Forum
- Fish In/Fish Out Monitoring
- Fish Passage
- Fisher Slough Restoration
- Flood Control Assistance Account Program (FCAAP)
- Flood Hazard and Ecosystem Management Coordination
- Floodplain Permit Streamlining Workgroup for Nooksack
- Floodplains by Design (FbD)
- French Slough Drainage Management
- Generative AI-Mediated Knowledge Management Tool
- Green River Stormwater Retrofit Estimate
- Habitat Service Quantification Methods Assessment
- Habitat Work Schedule
- Haskell Slough Protection and Restoration
- Hazard Mitigation Grant Program (HMGP)
- Henderson Inlet Community Shellfish Farm
- High Resolution Change Detection
- Impacts of Shoreline Armoring
- Improving Acquisition Systems Workshop
- Integrated Nearshore Priorities Project
- Intensively Monitored Watersheds
- Intertidal Biotic Community Monitoring
- Island Unit Estuary Restoration
- Jefferson County Eelgrass Protection
- Jim Creek Channel Enhancement
- Jimmycomelately Restoration
- Juvenile salmon response to landscape connectivity change within two Puget Sound river estuaries
- Kilisut Restoration
- King County Agricultural Drainage Assistance Program (ADAP)
- King County Farm Preservation Program (FPP)
- King County Flood Control District Cooperative Watershed Management Program (CWM)
- Kitsap County Regional Shoreline Restoration Project
- Kitsap Natural Resource Asset Management Project
- Knowledge Creation
- Kwaxala
- Kwoneesum Dam Removal
- Land Cover Demonstration Project
- Land and Water Conservation Fund (LWCF)
- Larson's Reach Floodplain Restoration
- Leque Island Restoration
- Living Dike Roundtable
- Livingston Lagoon Restoration
- Lower Canyon Creek Restoration
- Lower Skykomish Floodplain Design
- Lower Skykomish Floodplain Land Strategy
- Lower Skykomish Reach Scale Plan
- Lower Snohomish Reach Scale Plan
- Mapping Bluffs and Beaches to Quantify Sediment Supply
- Mapping Bluffs and Beaches to Quantify Sediment Supply 2021
- Marine Data Centre
- Marysville Mitigation Site
- Maulsby Mudflat Reconnection and Restoration
- Maximizing Benefits of Shoreline Armor Removal
- Meadowdale: Informing Puget Sound coastal stream restoration
- Measuring Coastal Bluff Recession Rates Throughout the Puget Sound Region
- Mid-spencer Island Restoration
- Milltown Island Restoration
- Nason Ridge Community Forest
- National Agricultural Imagery Program
- National Coastal Wetlands Conservation Grant
- Native Riverscape Agroforestry/Design Toolkit
- Nearshore Monitoring Strategy
- Nearshore Strategies Analysis
- Nisqually Community Forest
- Nisqually Delta Distributary Restoration Pre-design
- Nisqually Refuge Restoration
- Nisqually River Delta Sediment Budget and Assessment of Opportunities to Recovery Sediment Supply to Sustain Marsh
- Nisqually To Point Defiance Nearshore Restoration Assessment
- Nisqually Watershed Ecosystem Service Transaction Pilot
- No Child Left Inside (NCLI)
- Nooksack Floodplain Integrated Management Planning
- Nooksack Floodplain Restoration with Engineered Log Jams
- Nooksack Watershed General Stream Adjudication
- North Ebey Island Restoration
- North Sound Riparian Conference
- Northwest Maritime Center Dock
- Old Soldiers Home Levee Setback
- Olympia Oyster Restoration in North Puget Sound
- Olympic Sculpture Park Restoration
- PREDICTING SHOREFORM EVOLUTION IN PUGET SOUND Guidelines and Tools to Estimate Gravel Transport
- Pacific Coast Salmon Recovery Fund (PCSRF)
- Partners for Fish and Wildlife Program
- Pierce County Levee Setback Planning
- Plants for the People Nursery
- Population Recovery Approach
- Port Susan Marine Stewardship Area
- Port Susan Restoration
- Predicting Rates of Channel Development
- Predicting Sea Level Rise Impacts on Ag Production
- Prioritizing Beach Restoration and Protection
- Priority Habitats and Species
- Puget Sound Action Agenda
- Puget Sound Coastal Storm Modeling System (PS-CoSMoS)
- Puget Sound Ecosystem Monitoring Program
- Puget Sound Ecosystem Portfolio Model
- Puget Sound Large River Delta Tidal Restriction and Wetland Mapping
- Puget Sound Mapping Project
- Puget Sound Marine Riparian Mapping
- Puget Sound Marine and Nearshore Grant Program
- Puget Sound National Estuary Program (NEP)
- Puget Sound Nearshore Ecosystem Restoration Project
- Puget Sound Nearshore Habitat Conservation Calculator
- Puget Sound Salmon Recovery Plan
- Puget Sound Tidal Restriction and Wetland Mapping
- Puget Sound Vital Signs
- Puget Sound Watershed Characterization Project
- Qwuloolt Restoration
- Red Salmon Slough Restoration
- Regenerate Cascadia
- Regenerative Riverscape Agroforestry
- Regional Support Team for Biocultural Restoration of Riverscapes
- Restoration For All
- Riparian Data Engine
- Riparian Restoration and Protection Initiative
- River Delta Adaptive Management Strategy/1. Executive Summary
- River Delta Adaptive Management Strategy/3. Delta Components and Processes
- River Delta Adaptive Management Strategy/4. Organizing Learning around Critical Dynamics
- River Delta Adaptive Management Strategy/5. Social Organization
- River Delta Adaptive Management Strategy/6. Core Monitoring Strategy
- River Delta Adaptive Management Strategy/Development Notes
- River Delta Adaptive Management Strategy/Learning Project Scope of Work Template
- River Delta Adaptive Management Strategy/Peer Review Request - June 2013
- River Delta Consortium
- Riverscape Commons Mapping
- Rose Foundation Puget Sound Stewardship & Mitigation Fund
- Salish Sea Marine Survival Project
- Salmon Creek Estuary Fill Removal
- Salmon and Steelhead Habitat Inventory and Assessment Program
- San Juan County Marine Stewardship Area
- Science Sprints to Support Regulation
- Seattle Foundation
- Shore Friendly Program
- Shoreline Monitoring Toolbox
- Skagit Delta Intensively Monitored Watershed Project
- Skagit Delta Tidegates and Fish Initiative
- Skagit Farm, Fish and Flood Initiative
- Skagit Farmland Legacy Program
- Skokomish Delta Restoration
- Skykomish Bio-Cultural Restoration Field Station
- Skykomish Braided Reach Project
- Skykomish Habitat Mitigation Bank
- Skykomish-Snohomish Rivers Recreation Coalition
- Smith Island Restoration
- Sno-Stilly Riparian Zone Management Strategy
- Snohomish Agricultural Resilience
- Snohomish Agriculture Resilience Plan
- Snohomish Basin Forest Ecosystem Services Pilot Project
- Snohomish Delta Ecosystem Monitoring and Evaluation
- Snohomish Delta Story Map
- Snohomish Estuary Restoration Effects on Temperature, Salinity, and Tides
- Snohomish Farmland Protection Strategy
- Snohomish Floodplain Acquisition Strategy
- Snohomish Railroad Grade Beach Nourishment
- Snoqualmie Fish, Farm & Flood Initiative
- Snoqualmie Fish, Farm and Flood Initiative
- Social Marketing to Reduce Shoreline Armoring
- Spencer Island Restoration
- Standard Conservation Project Description
- State Salmon Programs
- Steamboat Slough Mitigation Site
- Stewart Mountain Community Forest
- Stillaguamish Delta Dredged Sediment Re-use
- Stillaguamish Delta Dynamics Affecting Restoration
- Stillaguamish Valley Protection Initiative
- Stream Flow Restoration Program
- Sustainable Agriculture Research and Education Program (SARE)
- Sustainable Farms and Fields Grant Program
- Swinomish Slough Restoration
- Teanaway Community Forest
- Technical Assistance Registry
- The Catalyst Site
- The Ecosystem Guid/Field Station Infrastructure
- The Ecosystem Guild/Design Charrette
- The Ecosystem Guild/Knotweed Control Experiments
- The Ecosystem Guild/Photo Documentation Protocol
- The Ecosystem Guild/Site Steward Apprenticeship
- The Ecosystem Guild/Work Lead Training
- The Nutrient Network
- Three Crabs Restoration
- Thurston Climate Mitigation Collaborative
- Thurston County Aquisition Assessment
- Thurston County Basin Assessment
- Tidal Channel Reference Model
- Tidal Channel Restoration Guidelines
- Tidal Fish Passage & Connectivity
- Tide Gate Effects Analysis
- Titlow Lagoon Restoration
- Tulalip Landfill Cleanup
- Union Slough Mitigation
- Union Slough Restoration
- Urban and Community Forestry Program (UCF)
- Use of Large Wood in Shoreline Restoration
- VELMA Watershed Modeling in Puget Sound
- Visualizing Ecosystem Land Management Assessments (VELMA) Model
- Voluntary Clean Water Guidance for Agriculture
- Washington Channel Migration Zone Mapping
- Washington Coastal Hazards Resilience Network
- Washington State Hydrographic Dataset
- Washington Water and Salmon Fund Finder
- Washington Wildlife and Recreation Program (WWRP)
- Watershed Maps
- Wetland Intrinsic Potential Tool
- Wetland Reserve Program
- Whatcom Drainage Maintenance Guidance
- Wiley Slough Restoration
- Woodard Creek Stormwater Retrofit Study
- Working Buffer Pilot Project
- Zis a Ba Restoration