Fir Island Farm Restoration: Difference between revisions
Pcereghino (talk | contribs) mNo edit summary |
Pcereghino (talk | contribs) mNo edit summary |
||
Line 6: | Line 6: | ||
==Notes== | ==Notes== | ||
*The project is described in four PRISM records: | *The project is described in four PRISM records: | ||
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=18-2626 Cattail management (2018) | |||
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=14-1022 PSAR Large Capital Funding (2014) for construction | |||
**[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=13-1051 Fir Island Farms Final Design Phase 2.3(2013)] | **[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=13-1051 Fir Island Farms Final Design Phase 2.3(2013)] | ||
**[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=12-1889 Fir Island Farm Restoration (2012)] | **[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=12-1889 Fir Island Farm Restoration (2012)] - this appears to have since been since merged. | ||
**[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=12-1205 Fir Island Farm Restoration Final Design(2012)] | **[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=12-1205 Fir Island Farm Restoration Final Design(2012)] | ||
**[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=09-1444 Fir Island Farm Restoration Feasibility Study(2009)] | **[https://secure.rco.wa.gov/PRISM/search/ProjectSnapshot.aspx?ProjectNumber=09-1444 Fir Island Farm Restoration Feasibility Study(2009)] |
Revision as of 23:56, 12 July 2021
- Salish Sea References
- Ecology Shoreline Photography Viewer
- The Encyclopedia of Puget Sound provides a peer reviewed version of the wiki
- PRISM Project Search
- Washington Coastal Atlas
- UW River History Project
- Wiki Rules
- Wiki text does not reflect the policy or opinion of any agency or organization
- Please adhere to our Social Contract and Style Guide
- Complain here, and be nice.
The Washington Department of Fish and Wildlife (WDFW) owns approximately 264 acres of upland in the vicinity of Browns Slough, Dry Slough and Claude Davis Slough (Fir Island Farm) in the Skagit River delta that is currently managed as a reserve for Snow Geese. Approximately 240 acres of the site are farmed. Natural tidal exchange to the site has been eliminated by dikes running along the bay front and along the southeastern side of Browns Slough. This altered tidal prism combined with deposition of sediment eroded from adjacent farm fields has greatly reduced tidal channel and marsh habitat compared to historic conditions both inside and outside of the dikes. Currently there are tide gates that allow for upland drainage but block fish passage through the dikes at Browns Slough, Claude O. Davis Slough and Dry Slough. The historic connection between Claude O. Davis Slough and Dry Slough has also been eliminated.
Notes[edit]
- The project is described in four PRISM records:
- [https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=18-2626 Cattail management (2018)
- [https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=14-1022 PSAR Large Capital Funding (2014) for construction
- Fir Island Farms Final Design Phase 2.3(2013)
- Fir Island Farm Restoration (2012) - this appears to have since been since merged.
- Fir Island Farm Restoration Final Design(2012)
- Fir Island Farm Restoration Feasibility Study(2009)
- Shannon & Wilson 2011 provides feasibility analysis and 30% design on selected alternative.
- WDFW Medium Article