File:Cereghino 2019 DRAFT project description problem focus group.pdf
Jump to navigation
Jump to search
Cereghino_2019_DRAFT_project_description_problem_focus_group.pdf (file size: 581 KB, MIME type: application/pdf)
- Last Ten Documents
- Speybroeck et al 2006 beach nourishment coastal defense
- Kindeberg et al 2022 multifunctional nature-based coastal defense
- Shipman 2001 beach nourishment puget sound.pdf
- Johannessen & Waggoner 2008 lummi shore road monitoring.pdf
- Baker et al 2020 restoration scaling HaBREM
- WSE 2021 snohomish hydrologic and hydraulic modelling.pdf
- Booth et al 2021 lower skykomish geomorphic assessment.pdf
- RCO et al 2023 Align grant coordination MOU.pdf
- Skidmore & Wheaton 2022 riverscapes as adaptation infrastructure
- ESA 2022 invasive species & salmon recovery snohomish.pdf
- Wiki Rules
- Wiki text does not reflect the policy or opinion of any agency or organization
- Please adhere to our social contract
- Complain here, and be nice.
- What Links To This Page?
- Documents (← links)
- Align Grant Coordination Workgroup (file link) (← links)
- Continuous Improvement/Claims (file link) (← links)
- Standard Conservation Project Description (file link) (← links)
- Standard Conservation Project Description
- Coordinated Investment
- The output of a focus group workshop to explore the inefficiency of repeatedly re-describing projects over the project lifecycle.
- Submitted as draft to the Align - Washington Ecosystem Grant Coordination Workgroup
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 22:20, 12 November 2019 | (581 KB) | Pcereghino (talk | contribs) | {{document}} *Standard Conservation Project Description *Coordinated Investment *The output of a focus group workshop to explore the inefficiency of repeatedly re-describing projects over the project lifecycle. |
You cannot overwrite this file.
File usage
The following 3 pages use this file: