Sundberg Gravel Mine: Difference between revisions

From Salish Sea Wiki
Line 20: Line 20:
*[[file:Hornbein 2019 green cove delayed review.pdf]] gives theh City's notice to developer that review will be delayed due to site complexity.
*[[file:Hornbein 2019 green cove delayed review.pdf]] gives theh City's notice to developer that review will be delayed due to site complexity.
*[[file:Thomas 2019 green cove document review analysis recommendations.pdf]] provides a review of site issues completed by city contractor.
*[[file:Thomas 2019 green cove document review analysis recommendations.pdf]] provides a review of site issues completed by city contractor.
*[[file:City of Olympia 2019 green cove garden substantive review w attachments.pdf]] is a large document in which the city issues its substantive review describing the proposal as not complying with stormwater standards and not sufficiently characterizing fill, and includes detailed comments from city staff corresponding with the developers technical staff.
*[[file:Dierker & Kronenberg 2019 response to green cove garden document review.pdf]] proposes that the city's review of evidence was inadequate, providing detailed examples.
*[[file:Dierker & Kronenberg 2019 response to green cove garden document review.pdf]] proposes that the city's review of evidence was inadequate, providing detailed examples.
*The [[City of Olympia]] has provided "substantive review comments" on August 8, 2019, indicating that additional information is necessary to review the preliminary plat.

Revision as of 17:49, 17 August 2019


Wiki Rules


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites

Google earth image showing water flow pathways in the Green Cove Creek Watershed

The Sundberg Mining Pit is an abandoned gravel mine in the City of Olympia and at the headwaters of the Butler Cove Watershed and Green Cove Watershed. The property appears to be controlled by Gerald Mahan with a development corporation and registered agent in Puyallup, Washington. The City received a complete proposal to build 181 houses on the site in February, 2019.

Notes

  • The 2019 review has been focused on two issues: the management of storm water consistent with protection of Green Cove Creek, and the potential for contamination from unregulated dumping of debris on the site.
  • 2016 article describing a 2016 proposal from the same building at the same site that was withdrawn - http://janineslittlehollywood.blogspot.com/2016/08/former-sundberg-mining-pit-proposed-for.html
  • The 2013 "no further action" determination by Ecology was based on an extensive review of underground fuel tank cleanup sites completed by a contractor for Ecology, and was unlikely to have considered other concerns or claims about the site.
  • State Mining law RCW 78.44.131 indicates "All reclamation activities shall be completed not more than two years after completion or abandonment of surface mining on each segment of the area for which a reclamation permit is in force." It is unclear that reclamation has occurred at this site.
  • At a community meeting on 3/1/19 the lawyer for the developer stated that he would recommend to the owner that he submit to a toxics investigation, if it met their criteria and was paid for by neighbors.
  • Several neighbors claim that over the last several generations truckloads of toxic materials were dumped and buried in the glacial swales on the site.
  • The City is maintaining a record of the preliminary plat proposal - http://olympiawa.gov/news-and-faq-s/construction-news/green-cove-park.aspx