Culvert Replacement Regulatory Coordination: Difference between revisions

From Salish Sea Wiki
mNo edit summary
Line 13: Line 13:
==Authorities==
==Authorities==
*http://apps.leg.wa.gov/rcw/default.aspx?cite=77.55 - Hydraulic Project Approval process regulates construction in state waters.
*http://apps.leg.wa.gov/rcw/default.aspx?cite=77.55 - Hydraulic Project Approval process regulates construction in state waters.
*[[ORIA]] supports and maintains the [[
*[[ORIA]] supports and maintains the JARPA (Joint Aquatic Resources Permit Application).


==Resources==
==Resources==

Revision as of 23:07, 27 November 2018


Wiki Rules
  • Wiki text does not reflect the policy or opinion of any agency or organization
  • Please adhere to our social contract
  • Complain here, and be nice.


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

This effort is linked to Coordinated Investment pilot work

This is a Continuous Improvement test project that aims to reduce the per culvert cost of regulatory review. The proposal is to develop standard methods for presenting an engineering design that is consistent with best design practices, so that regulatory review can be fast and final, without unexpected requests for information and limiting modification. Pilot work is being done in support of Snohomish County efforts, with an eye toward the effects of the Culvert Case.

Status

Authorities

Resources

Participation

The following staff are providing technical assistance within limits of their individual work plans:

  • Project coordinator: Paul Cereghino

Regulatory Team

NOAA.pngWDFW.pngWDOE.pngUSACE.pngTulalip.png