This is a [[coordinated investment]] project that aims to reduce the per culvert cost of regulatory review.  The proposal is to develop standard methods for presenting an engineering design that is consistent with best design practices, so that regulatory review can be fast and final, without unexpected requests for information and limiting modification.  Pilot work is being done in Snohomish County generally following a three step process, involving the county and regulatory partners along the way:
'''This is a [[coordinated investment]] project that aims to reduce the per culvert cost of regulatory review.  The proposal is to develop standard methods for presenting an engineering design that is consistent with best design practices, so that regulatory review can be fast and final, without unexpected requests for information and limiting modification.  Pilot work is being done in Snohomish County generally following a three step process, involving the county and regulatory partners along the way:'''
#Gather information about the interest and concerns of all parties involved in developing culvert designs and then giving them permits, and look for commonalities.
#Gather information about the interest and concerns of all parties involved in developing culvert designs and then giving them permits, and look for commonalities.
#Examine a set of 10-20 culverts that the county would like to replace, and divide them into groups based on regulatory pathway
#Examine a set of 10-20 culverts that the county would like to replace, and divide them into groups based on regulatory pathway

Revision as of 19:39, 15 June 2017


Wiki Rules
  • Wiki text does not reflect the policy or opinion of any agency or organization
  • Please adhere to our social contract
  • Complain here, and be nice.


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

This is a coordinated investment project that aims to reduce the per culvert cost of regulatory review. The proposal is to develop standard methods for presenting an engineering design that is consistent with best design practices, so that regulatory review can be fast and final, without unexpected requests for information and limiting modification. Pilot work is being done in Snohomish County generally following a three step process, involving the county and regulatory partners along the way:

  1. Gather information about the interest and concerns of all parties involved in developing culvert designs and then giving them permits, and look for commonalities.
  2. Examine a set of 10-20 culverts that the county would like to replace, and divide them into groups based on regulatory pathway
  3. Develop templates and boilerplate language with which to submit the 10-20 culverts for regulatory review, and track efficiency.

We anticipate that learning from this process can support larger scale efforts.

Notes

  • The following staff are providing technical assistance within limits of their individual work plans.
  • Partner staff are working on a scope of work using an on-line collaboration platform (Trello).
NOAA.pngWDFW.pngWDOE.pngUSACE.pngTulalip.png