Culvert Replacement Regulatory Coordination: Difference between revisions

From Salish Sea Wiki
(Created page with "{{effort}} This is a coordinated investment project that aims to reduce the per culvert cost of regulatory review. The proposal is to develop standard methods for present...")
 
Line 3: Line 3:


==Notes==
==Notes==
*Existing project work involves NOAA,  
*The following staff are providing technical assistance within limits of their individual work plans.
[[File:Culvert work plan.docx]]
**[[NOAA]] - Paul Cereghino, Janet Curran
[[File:Culvert regulatory coordination A3.docx]]
**[[Snohomish County]] - Erik Stockdale
**[[WDFW]] - Kirk Lakey
**[[Ecology]] - Diane Hennessey
**[[Tulalip Tribes]] - Morgan Ruff
**[[USACE]] - Frank Nichols (in pre-application consultation capacity)
*Partner staff are working on a scope of work using an on-line
**[[File:Culvert work plan.docx]]
**[[File:Culvert regulatory coordination A3.docx]]


{{credit}}{{NOAA}}{{WDFW}}{{WDOE}}{{USACE}}{{Tulalip}}{{end}}
{{credit}}{{NOAA}}{{WDFW}}{{WDOE}}{{USACE}}{{Tulalip}}{{end}}

Revision as of 19:09, 15 June 2017


Wiki Rules


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites

This is a coordinated investment project that aims to reduce the per culvert cost of regulatory review. The proposal is to develop standard methods for presenting an engineering design that is consistent with best design practices, so that regulatory review can be fast and final, without unexpected requests for information and limiting modification.

Notes

NOAA.pngWDFW.pngWDOE.pngUSACE.pngTulalip.png