*In the [[Deschutes Delta]] [[dam removal]] is the method of restoration.
*In the [[Deschutes Delta]] [[dam removal]] is the method of restoration.
==Ongoing Projects (updated 7/6/2015)==
==Ongoing Projects (updated 7/6/2015)==
*[[Skokomish Delta]]
*'''[[Skokomish Delta]]
**[[Skokomish Delta Restoration]] - a single page describes all phases.  Phase three involves breaches to a utility access causeway.  Work will be substantively complete in 2015.
**[[Skokomish Delta Restoration]] - a single page describes all phases.  Phase three involves breaches to a utility access causeway.  Work will be substantively complete in 2015.
*[[Snohomish Delta]]
*'''[[Snohomish Delta]]
**[[Qwuloolt Restoration]] - setback levee construction is underway.  First tides anticipated in 2016
**[[Qwuloolt Restoration]] - setback levee construction is underway.  First tides anticipated in 2016
**[[Smith Island Restoration]] - Setback levee construction anticipated in 2015, with first tides in 2016 pending resolution of a funding shortfall.
**[[Smith Island Restoration]] - Setback levee construction anticipated in 2015, with first tides in 2016 pending resolution of a funding shortfall.
*[[Stillaguamish Delta]]
**[[Mid-spencer Island Restoration]] - additional dike removal aims to be coordinated with Smith Island mobilization.
**[[Diking District Six Restoration]] - is a potential project has some design complete.
**[[North Ebey Island Restoration]] - is a potential action that might benefit diking district maintenance.
*'''[[Stillaguamish Delta]]
**[[Leque Island Restoration]] - WDFW has selected a full dike removal alternative, is initiating design, with first tides anticipated in 2017 or 2018.
**[[Leque Island Restoration]] - WDFW has selected a full dike removal alternative, is initiating design, with first tides anticipated in 2017 or 2018.
**[[Matterand Restoration]] - Stillaguamish tribe is completing feasibility work.  No projected completion date.
**[[Matterand Restoration]] - Stillaguamish tribe is completing feasibility work.  No projected completion date.
*[[Skagit Delta]]
*'''[[Skagit Delta]]
**[[Fir Island Farm Restoration]] - Setback levee construction underway, with first tide anticipated in 2016.
**[[Fir Island Farm Restoration]] - Setback levee construction underway, with first tide anticipated in 2016.
*[[Nooksack Delta]]
*'''[[Nooksack Delta]]
**[[Lummi Nation Mitigation Bank]] - In development
**[[Lummi Nation Mitigation Bank]] - In development
**[[Lower Nooksack Floodplain Restoration]] - Whatcom County completing analysis consistent with flood planning.
**[[Lower Nooksack Floodplain Restoration]] - Whatcom County completing analysis consistent with flood planning.
*[[Dungeness Delta]]
*'''[[Dungeness Delta]]
**[[Three Crabs Restoration]] - reconstruction of Meadowbrook Creek floodplain and nearshore anticipated in 2016.
**[[Three Crabs Restoration]] - reconstruction of Meadowbrook Creek floodplain and nearshore anticipated in 2016.
==Past Work==
==Past Work==
*[[Nisqually Delta]] -  
*[[Nisqually Delta]] - [[Nisqually Refuge Restoration]] and [[Red Salmon Slough Restoration]] are being monitored.  [[Nisqually Delta Distributary Restoration Pre-design]] aims to evaluate options for increasing sediment routing to restored delta plain.
*[[Quilcene Delta]]
*'''[[Quilcene Delta]]''' - a number of less well documented projects are complete, with the Removal of the South Big Quilcene Levee in feasibility.
*[[Skokomish Delta]]
*'''[[Skokomish Delta]]''' - [[Skokomish Delta Restoration]] describes three phases of work, with two phases restoring over 300 acres of estuarine floodplain.
*
*'''[[Skagit Delta]]''' - [[Wiley Slough Restoration]], [[Deepwater Slough Restoration]], [[Fisher Slough Restoration]], and [[Milltown Island Restoration]] have been largely completed.  [[Evaluating salmon rearing limitations in river deltas]] is looking at system scale patterns of fish use affected by restoration in the Skagit.
*'''[[Snohomish Delta]]''' - [[Marysville Mitigation Site]], [[Union Slough Restoration]], and [[Spencer Island Restoration]] are largely complete.  [[Evaluating salmon rearing limitations in river deltas]] is looking at system scale patterns of fish use affected by restoration in the Skagit.





Revision as of 16:56, 6 July 2015


Wiki Rules


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites

This page is for summarizing on-wiki resources describing the restoration of Puget Sound River Deltas.

Methods[edit]

Ongoing Projects (updated 7/6/2015)[edit]

Past Work[edit]


Planning and Analysis[edit]

Funding and Implementation[edit]

Funding for a large Puget Sound Delta Restoration action typically requires mulitple funding sources to support feasibility, design, construction and evaluation of project work.

Objectives and Status[edit]

  • Individual salmon recovery plans may have set quantitative goals for river delta restoration.
  • As part of the Puget Sound Vital Signs effort, the Puget Sound Partnership has set an estuary restoration goal, both to restore a proportion of total historical delta wetlands, and to meet salmon recovery objectives.