*Two contracts observed in PRISM:
*Two contracts observed in PRISM:
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=14-1876 ESRP Design Contract (2014)]
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=14-1876 ESRP Design Contract (2014)]
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=16-1559 Restoration Contract (2016)
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshot.aspx?ProjectNumber=16-1559 Restoration Contract (2016)]
*Key Documents in PRISM
*Key Documents in PRISM
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshotAttachmentData.aspx?id=201818 Conceptual Design]
**[https://secure.rco.wa.gov/prism/search/ProjectSnapshotAttachmentData.aspx?id=201818 Conceptual Design]

Revision as of 22:54, 13 July 2021


Wiki Rules


Link to List of Workgroups Link to List of Topics Link to List of Places

Link to List of Efforts Link to List of Products Link to List of Documents Link to List of Graphics Link to List of Websites

Link to Delta Sites Link to Embayment Sites Link to Beach Sites Link to Rocky Headland Sites

Link to Headwater Sites Link to Lowland Watershed Sites Link to Floodplain Sites

This effort is linked to Coordinated Investment pilot work

The dikes of Mid-spencer island breached (in the 1960's), resulting in restoration of tidal flow but poor connectivity. Snohomish County is developing designs to remove additional dikes to support more complex channel formation, and improve fish access. Work will be completed as part of the Smith Island Restoration